P2'' Anode Front End Data
Preliminary Results from Beam Test 99 at CERN
(presented by N.Terentyev)
EMU meeting at CERN, Sep 11-12, 1999
Talk transparencies (Talk)
Single plane efficiency vs HV (Efficiency)
Detected GIF rate (By plane)
(All planes)
Bunch Crossing Efficiency vs HV
(Bunch X-ing Eff)
Comments after meeting
- The results on GIF rate were obtained from online histograms without
correction for the
cross talks at large amplitudes of the signal. Therefore the GIF rate was
likely to be overestimated at HV > 3.5 kV. Such correction will be done in
offline analysis.
teren@fnal.gov
Last modified: Oct 6 11:20:00 CST 1999